← Back to templatesHome
🏗️

Crane Lift Briefing (Pre-Lift)

Hands-free pre-lift briefing: load, rigging, wind, exclusion zone, roles, and stop-work triggers.

You’ll be asked to sign in first.
constructionsafetylift-plan
Built for jobsite briefings where hands are busy with rigging and radios.

Form preview

Lift
Project
TextRequired
[not set]
Lift Time
Date & TimeRequired
📅⏰ Date & time
Load & Checks
Load Description
Text AreaRequired
Estimated Weight (kg)
Number
Enter estimated weight (kg)
Rigging Checked
ToggleRequired
[not set]
Wind Within Limit
ToggleRequired
[not set]
Exclusion Zone Set
ToggleRequired
[not set]
Team
Roles
List
NameRole
+ Add+ Add
Stop-Work Triggers
Text AreaRequired
Notes
Text Area
EXAMPLE REPORTSample data — shows what you’ll get after recording

Example filled report

Lift
Project
Vienna HQ Renovation
Lift Time
02/05/2026 9:00 AM
Load & Checks
Load Description
Lift HVAC unit to roof using spreader bar and 4-point sling.
Estimated Weight (kg)
680
Rigging Checked
Yes
Wind Within Limit
Yes
Exclusion Zone Set
Yes
Team
Roles
NameRole
TomasCrane operator
ElifLift supervisor
NikoRigger
Stop-Work Triggers
Stop if wind gusts increase, if anyone enters exclusion zone, or if rigging shifts. Stop on any unclear hand signal.
Notes
Radio channel 3. Spotter posted at stairwell access.
Crane Lift Briefing (Pre-Lift) | Voiz Report Templates